TM 5-3810-293-14&P-1
CAUTION
Equipment operation is allowable with minor leakage (class I or II). Of course consideration must be
given to the fluid capacity in the item/system being checked/inspected. When in doubt,
notify your supervisor.
Class III leaks should be corrected before releasing equipment for operation.
f. If the crane doesn't work properly and you can't see what is wrong, refer to troubleshooting instructions.
3-2-45