(2) Install the split rear drum lagging on the
(3) Install the crowd chain tightener
as
rear drum as shown on figure 2-23.
instructed on figure 2-25.
figure 2-3
ME 3810-294-10/2-25
Figure 2-25. Crowd chain tightener.
(4) with the shovel boom cribbed to the height
boom foot pin holes in the boom with those in the
of the revolving frame boom foot lug holes (fig. 2-26),
revolving frame.
back the truck crane to the boom and aline the