TM 10-1670-251-12&Pshown, for each level. The work time figure representsthe average time required to restore an item (assembly,subassembly, component, module and item, or system)to a serviceable condition under typical field operatingconditions. This time includes preparation time(including any necessary disassembly/assembly time),troubleshooting/fault location time, and qualityassurance/quality control time in addition to the timerequired to perform the specific tasks identified for themaintenance functions authorized in the maintenanceallocation chart. The symbol designations for thevarious maintenance levels are as follows:C-Operator or crewO-Unit MaintenanceF-Intermediate Direct Support MaintenanceH-Intermediate General Support MaintenanceL-Specialized Repair Activity (SRA)D-Depot Maintenancee.Column5,ToolsandEquipment. Column 5specifies by code, those common tools sets (notindividual tools) and special tools, TMDE, and supportequipment required to perform the designated function.f.Column6,Remarks. This column shall, whenapplicable contain a letter code, in alphabetic order,which shall be keyed to the remarks contained inSection IV.B-5
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business