Chapter 1. INTRODUCTION - TM-5-3810-227-150035Section II. DESCRIPTION AND DATA - TM-5-3810-227-150036Figure 2. Crane-shovel, right, three-quarter rear view.Corps of Engineers 30 foot boom identification plateTabulated Data - TM-5-3810-227-150039Tabulated Data - continued - TM-5-3810-227-150040Table 1. Crane Lifting CapacitorCarrier Wiring Diagram.Crane Wiring Diagram.Table 2. Crane Boom Angle and Height DataChapter 2. INSTALLATION AND OPERATION INSTRUCTIONS - TM-5-3810-227-150045Figure 4. Crane-shovel unloading instructions.Figure 5. Batteries, installation and removal.Section II. FRONT END ATTACHMENT, INSTALLATION AND REMOVALCable Reeving.Figure 7. Crane boom, removal and installation.Figure 8. Crane boom reeving diagram.Figure 11. Measuring cables.Section III. CONTROLS AND INSTRUMENTS - TM-5-3810-227-150053Carrier Controls and Instruments - TM-5-3810-227-150054Air Pressure Gage - TM-5-3810-227-150055Figure 13. Carrier controls and instruments.Figure 13. Carrier controls and instruments. - continuedCrane-Shovel Controls and InstrumentsRight Hand Hoist Clutch and Power Load Lowering Lever Figure 14. Crane controls and instruments.Warning LightsSection IV. OPERATION UNDER USUAL CONDITIONS - TM-5-3810-227-150062Carrier OperationFigure 15. Operations and control positions.DRAGLINE OPERATION - TM-5-3810-227-150065Section V. OPERATION UNDER UNUSUAL CONDITIONS - TM-5-3810-227-150066Operation in Extreme Heat - TM-5-3810-227-150067Operation Under Rainy or Humid ConditionsSection VI. OPERATION OF AUXILIARY MATERIEL USED IN CONJUNCTION WITH THE CARRIER AND CRANEFigure 16. Heaters and controls (winterized unit only).Figure 16. Heaters and controls (winterized unit only) - continuedChapter 3. OPERATOR AND CREW MAINTENANCE INSTRUCTIONSFigure 17. Lubrication order.Figure 17. Lubrication order - continued - TM-5-3810-227-150074Figure 17. Lubrication order - continued - TM-5-3810-227-150075Figure 17. Lubrication order - continued - TM-5-3810-227-150076Figure 17. Lubrication order - continued - TM-5-3810-227-150077Figure 17. Lubrication order - continued - TM-5-3810-227-150078Figure 17. Lubrication order - continued - TM-5-3810-227-150079Figure 17. Lubrication order - continued - TM-5-3810-227-150080Figure 17. Lubrication order - continued - TM-5-3810-227-150081Figure 17. Lubrication order - continued - TM-5-3810-227-150082Figure 17. Lubrication order - continued - TM-5-3810-227-150083Figure 17. Lubrication order - continued - TM-5-3810-227-150084Figure 17. Lubrication order - continued - TM-5-3810-227-150085Figure 17. Lubrication order - continued - TM-5-3810-227-150086Figure 17. Lubrication order - continued - TM-5-3810-227-150087Figure 18. Engine oil filter service.Section II. PREVENTIVE MAINTENANCE SERVICESFigure 22. Daily preventive maintenance services.Figure 22. Daily preventive maintenance services. - continuedPREVENTIVE MAINTENANCE SERVICES - TM-5-3810-227-150092Quarterly Preventative Maintenance ServicesPREVENTIVE MAINTENANCE SERVICES - TM-5-3810-227-150094PREVENTIVE MAINTENANCE SERVICES - continued - TM-5-3810-227-150095PREVENTIVE MAINTENANCE SERVICES - continued - TM-5-3810-227-150096PREVENTIVE MAINTENANCE SERVICES - continued - TM-5-3810-227-150097Section III. TROUBLESHOOTING - TM-5-3810-227-150098 Engines Miss or Vibrate ExcessivelyEngine Knocks and Other NoisesPrimary Drive Chain Excessively NoisyImproper Air PressureCarrier Transmission Excessively No isy in Operation - TM-5-3810-227-150103Carrier Transmission Excessively No isy in Operation - TM-5-3810-227-150103_copy1Interference Suppression ComponentsFigure 24. Radio suppression components.Section V. CARRIER ENGINE FUEL SYSTEMFuel Tank, Lines, and FittingsFigure 29. Carrier engine carburetor screen service.Figure 30. Carrier engine carburetor adjustment.Figure 31. Carrier engine carburetor, removal and installation.Figure 34. Carrier engine accelerator linkage, removal and installation.Section VI. CRANE ENGINE FUEL SYSTEMFigure 37. Crane engine fuel tank, lines and fittings, removal and installation.Figure 38. Crane engine carburetor adjustment.Figure 40. Crane engine governor, adjustment.Figure 41. Crane engine governor, removal and installation.Figure 42. Crane engine fuel sediment bowl and screen service. Throttle Control and Choke ControlSection VII. CARRIER ENGINE ELECTRICAL SYSTEMS, CONTROLS AND INSTRUMENTSDistributor - TM-5-3810-227-150120Figure 46. Distributor, coil, points, condenser, and resistor, removal, adjustment and installation.Figure 47. Engine flywheel timing marks.Figure 49. Starter and solenoid test wiring diagram.Figure 50. Solenoid and starter, removal and installation.Starter Assembly - TM-5-3810-227-150125Figure 53. Carrier engine generator belt, adjustment, removal and installation.Generator Drive BeltFigure 56. Generator regulator removal, adjustment, and test wiring diagram.Test and Adjustment.Instrument Panel ComponentsFigure 57. Instrument panel gages, controls, lights, and temperature sending units, removal and installation.High Boom Indicator Light AssemblyHorn Button Assembly - TM-5-3810-227-150133Front Blackout Marker Service LightsHeadlight - TM-5-3810-227-150135Figure 62. Front light assemblies.Figure 63. Headlight, adjusting diagram.Figure 65. Horn, removal and installation.Section VIII. CRANE ENGINE ELECTRICAL SYSTEM, CONTROLS AND INSTRUMENTSFigure 70. Crane batteries, cables, and box, removal and installation.Generator AssemblySlave Receptacle - TM-5-3810-227-150142Figure 76. Horn assembly, removal and installation.Fan Belt and Hydraulic Steering Pump Belt - TM-5-3810-227-150144Water Tubes, Hoses, and FittingsThermostat Cover and Thermostats - TM-5-3810-227-150146Water Manifolds - TM-5-3810-227-150147Thermostat Housing AssemblyThermostat AssemblySection XI. CARRIER ENGINE LUBRICATION SYSTEMCrankcase BreatherOil Filter - TM-5-3810-227-150152Section XIII. CARRIER ENGINE INTAKE AND EXHAUST SYSTEMFigure 95. Carrier muffler, removal and installation.Figure 97. Valve cover, removal and installation.Valve Adjustment - TM-5-3810-227-150156Section XV. CARRIER ENGINE CLUTCH ASSEMBLYClutch AdjustmentFigure 103. Carrier engine clutch adjustment.Section XVI. CRANE HYDRAULIC SYSTEMHoist Drum Shaft Clutch Hydraulic Cylinders Hydraulic Tubes and FittingsSection XVII. CRANE CLUTCH AND BRAKE ASSEMBLIES CONTROLS AND LINKAGEFigure 109. Crane engine clutch adjustment.Figure 110. Clutch band adjustment, removal and installation.Cleaning and Inspection.Hoist Drum Shaft Clutches (Left-Hand and Right-Hand)Hoist BrakebandsSection XVIII. PRIMARY DRIVE ASSEMBLY AND GEAR GUARDSSection XIX. LOAD ROLLER ASSEMBLYFigure 118. Crane load rollers, removal, disassembly, reassembly, and installation.Section XX. SAFETY RATCHET AND JAW CLUTCH ASSEMBLIESFigure 120. Jaw clutch lever linkage, removal and installation.Section XXI. CRANE BOOM, PULLEYS, AND PULLEY BUSHINGSFigure 122. Crane boom, disassembly and reassembly.Bridle AssemblySection XXII. CRANE CAB ASSEMBLYCleaning, Inspection, and Repair. - TM-5-3810-227-150178Figure 126. Operator's door, removal and installationOperator's Seat - TM-5-3810-227-150180Section XXIII. CARRIER STEERING ASSEMBLYSteering ValveFigure 131. Carrier steering valve, removal and installation.Figure 132. Steering wheel, removal and installation.Section XXIV. WHEELS, TIRES, AND STOCK ABSORBERSFigure 16. Front wheel, removal and installation.Figure 137. Front wheel bearings, hub, drum, exploded view.Figure 138. Rear wheel, removal and installation.Figure 139. Gear wheels bearings, axle, drum, and hub, exploded view.Section XXV. CARRIER AIRBRAKE SYSTEMFigure 141. Carrier airbrake system, piping diagram.Air Lines, Hoses, and FittingsAir Pressure Gage - TM-5-3810-227-150193Tractor Protection ValveAir Emergency and Service Shutoff Valves - TM-5-3810-227-150195Rear Brakeshoes - TM-5-3810-227-150196Section XXVI. PROPELLER SHAFTS AND CONTROLSFigure 149. Propeller shaft and universal joint, removal disassembly, exploded view.Figure 150. Transmission control rod assemble., removal and installation.Figure 150. Transmission control rod assemble., removal and installation - continuedFigure 151. Transfer case levers, and control rods, removal and installationOutrigger AssembliesFigure 153. Outrigger assembly, front and rear.Section XXVII. CARRIER CAB AND FENDERSOperator's Seat - TM-5-3810-227-150205Cab Floorboard - TM-5-3810-227-150206Right-Front Fender - TM-5-3810-227-150207Section XXIX. CARRIER WINTERIZATION EQUIPMENTFigure 185. Control box assembly.Figure 164. Engine liquid coolant heater wiring diagram.Engine Heater AssemblyCab Heater Duds and DefrostersFigure 166. Carrier cab heater and engine heater components, removal and installation.Figure 167. Carrier cab heat duct and defrosters, removal and installation.Section XXX. CRANE WINTERIZATION EQUIPMENT.Heater Control BoxesFigure 175. Crane cab defrosters and heat ducts, removal and installation.Cab and Components, Heater AssemblyCrane Windshield Wiper BladeChapter 4. DIRECT AND GENERAL SUPPORT, AND DEPOT MAINTENANCE INSTRUCTIONSTable 3. Crane Engine Repair and Replacement StandardsTable 4. Carrier Engine Repair and Replacement StandardsTable 4. Carrier Engine Repair and Replacement Standards - continued - TM-5-3810-227-150223Table 4. Carrier Engine Repair and Replacement Standards - continued - TM-5-3810-227-150224BearingsBushingsSection III. REMOVAL AND INSTALLATION OF MAJOR ITEMSFigure 177. Crane cab assembly, removal and installation.Section IV. CRANE ENGINE CARBURETOR ASSEMBLYSection V. CRANE ENGINE GOVERNOR ASSEMBLYFigure 180. Crane engine carburetor assembly exploded view.Figure 181. Crane engine governor assembly, exploded view.Crane Engine Fuel Tank InstallationFigure 183. Crane engine generator assembly, exploded view.Section VII. CRANE ENGINE GENERATOR ASSEMBLYFigure 185. Crane engine starter assembly, exploded view.Section IX. CRANE ENGINE STARTER ASSEMBLYSection XI. CRANE ENGINE RADIATOR ASSEMBLYFigure 186. Crane engine distributor assembly, exploded view.Figure 187. Crane engine radiator assembly, removal and installation.Figure 188. Crane engine water pump assembly, exploded view.Section XIII. CRANE ENGINE CLUTCH ASSEMBLYSection XIV. CRANE ENGINE CYLINDER HEAD ASSEMBLY AND VALVESCrane Engine Cylinder Head Cleaning, Inspection, and RepairFigure 191. Crane engine cylinder head assembly, removal and installation, and nut tightening sequence.Figure 193. Crane engine valve assemblies, exploded ViewSection XV. CRANE ENGINE OIL PAN AND FILLER BLOCKSSection XVI. CRANE ENGINE OIL PUMP ASSEMBLYSection XVII. CRANE ENGINE PISTON AND CONNECTING ROD ASSEMBLIESCrane Engine Piston and Connecting Rod Assemblies Cleaning, Inspection, and RepairFigure 199. Crane engine piston and connecting rod assembly, exploded view.Section XVIII. CRANE ENGINE FLYWHEEL AND FLYWHEEL HOUSINGSection XIX. CRANE ENGINE FRONT MOUNT AND PULLEY ASSEMBLYFigure 202. Crane engine front mount and pulley assembly, removal and installation.Section XX. CRANE ENGINE TIMING GEAR COVER AND TIMING GEARSSection XXI. CRANE ENGINE CAMSHAFT ASSEMBLYSection XXII. CRANE ENGINE CRANKSHAFT ASSEMBLYFigure 206. Crane engine crankshaft assembly, removal and installationSection XXIII. CRANE ENGINE LOCKSection XXIV. CARRIER ENGINE CARBURETOR ASSEMBLYFigure 109. Carrier engine carburetor assembly, exploded view.Section XXV. CARRIER ENGINE SPEED GOVERNOR ASSEMBLYSection XXVI. CARRIER ENGINE GENERATOR ASSEMBLYSection XXVII. CARRIER ENGINE STARTER ASSEMBLYSection XXIX. CARRIER ENGINE ACCESSORY DRIVE ASSEMBLYSection XXX. CARRIER ENGINE RADIATOR ASSEMBLYFigure 213. Carrier engine radiator assembly,iFigure 213. Carrier engine radiator assembly, removal and installation.Section XXXII. CARRIER ENGINE OIL FILTER BASE AND OIL COOLER ASSEMBLYCarrier Engine Oil Filter Base and Oil Cooler Assembly InstallationFigure 216. Carrier engine rocker arm shaft and pushrods assembly, removal and installation.Section XXXIV. CARRIER ENGINE CYLINDER HEAD AND VALVESFigure 219. Carrier engine cylinder head and valves, exploded view.Carrier Engine Oil Pan Removal and DisassemblySection XXXVI. CARRIER ENGINE OIL PUMP ASSEMBLYSection XXXVII. CARRIER ENGINE CONNECTING ROD AND PISTON ASSEMBLIESFigure 225. Carrier engine piston and connecting rod, exploded view.Section XXXVIII. CARRIER ENGINE CLUTCH HOUSINGFigure 226. Carrier engine clutch housing, removal and installation.Figure 228. Carrier engine clutch and pressure plate, removal and installation.Section XL. CARRIER ENGINE FLYWHEEL AND FLYWHEEL HOUSINGFigure 229. Carrier engine flywheel and flywheel housing, removal and installationSection XLI. CARRIER ENGINE VIBRATION DAMPER AND PULLEY ASSEMBLYSection XLII. CARRIER ENGINE TIMING GEARSFigure 233. Carrier engine timing gears, removal and installation.Section XLIII. CARRIER ENGINE CAMSHAFTSection XLIV. CARRIER ENGINE CRANKSHAFT AND MAIN BEARINGSCarrier Engine Crankshaft and Main Bearings Cleaning, Inspection and RepairSection XLVI. CARRIER TRANSMISSION ASSEMBLYFigure 239. Carrier engine transmission assembly, exploded view.Figure 239. Carrier engine transmission assembly, exploded view - continued - TM-5-3810-227-150290Figure 239. Carrier engine transmission assembly, exploded view - continued - TM-5-3810-227-150291Figure 239. Carrier engine transmission assembly, exploded view - continued - TM-5-3810-227-150292Disassembly of various subasse bliesDrive out oil seal Carrier Transmission Assembly Cleaning, Inspection, and RepairCarrier Transmission Assembly Reassembly and Installation - TM-5-3810-227-150296Carrier Transmission Assembly Reassembly and Installation - TM-5-3810-227-150297Carrier Transmission Assembly Reassembly and Installation - continued - TM-5-3810-227-150298Carrier Transmission Assembly Reassembly and Installation - continued - TM-5-3810-227-150299Section XLVII. CARRIER TRANSFER CASE ASSEMBLYFigure 240. Carrier transfer case assembly, removal and installation.Figure 241. Carrier transfer case assembly, exploded view.Figure 241. Carrier transfer case assembly, exploded view - continuedSection XLVIII. CARRIER AIR COMPRESSOR ASSEMBLYFigure 243. Carrier air compressor assembly, exploded view.Figure 243. Carrier air compressor assembly, exploded view - continuedSection XLIX. CARRIER FRONT AIR BRAKE CHAMBER ASSEMBLYFigure 245. Carrier rear air brake chamber assembly, exploded view.Section LI. CARRIER MOISTURE EJECTOR VALVE ASSEMBLYSection LII. CARRIER AIR BRAKE DOUBLE CHECK VALVE ASSEMBLYFig. 248. Carrier handbrake, removal and installation.Carrier Handbrake Cleaning, Inspection, and RepairSection LIV. CARRIER FRONT SERVICE BRAKE ASSEMBLYSection LV. CARRIER REAR SERVICE BRAKE ASSEMBLYFigure 252. Carrier brake valve assembly, exploded view.Section LVII. CARRIER AIR BRAKE QUICK RELEASE VALVEFigure 254. Carrier trailer brake valve, explodedSection LIX. CARRIER AIR BRAKE PROTECTION VALVE ASSEMBLYSection LX. CARRIER AIR BRAKE RELAY ASSEMBLYSection LXII. CARRIER STEERING HYDRAULIC CONTROL VALVE ASSEMBLYSection LXIII. CARRIER STEERING HYDRAULIC CYLINDER ASSEMBLYFigure 258. Carrier steering gear assembly, removal and installationFigure 259. Carrier steering gear assembly.Figure 259. Carrier steering gear assembly - continuedSection LXV. CARRIER STEERING KNUCKLE AND SHAFT ASSEMBLYSection LXVI. CARRIER FRONT DIFFERENTIAL ASSEMBLYSection LXVII. CARRIER FRONT SPRING ASSEMBLYFigure 265. Carrier Front spring assembly.Section LXIX. EQUALIZING BEAM ASSEMBLYFigure 268. Equalizing beam assembly, removal and installation.Figure 269. Equalizing beam assembly exploded view.Carrier Rear, Rear Axle Differential Assemblies, Reassembly and InstallationFigure 271. Carrier rear axle differential assembly.Section LXXI. CARRIER ENGINE AND CRANE ENGINE, LIQUID HEATER REPAIR INSTRUCTIONSEngine Liquid Heater DisassemblyFlame Switch AdjustmentFlame Switch Test.Section LXXII. CARRIER CAB AND CRANE CAB, FRESH AIR HEATER REPAIR INSTRUCTIONSLXXIII. CRANE HYDRAULIC MASTER CYLINDER ASSEMBLIES AND CLUTCH CYLINDER ASSEMBLIESCrane Hydraulic Master Cylinder Assembly Reassembly and InstallationSection LXXIV. CRANE HOIST DRUM SHAFTFigure 278. Crane hoist drum shaft assembly.Section LXXV. CRANE COUNTERSHAFT ASSEMBLYSection LXXVI. CRANE INDEPENDENT BOOM HOIST SHAFT ASSEMBLYFigure 281. Crane independent boom hoist shaft assembly, removal and installation.Section LXXVII. CRANE HORIZONTAL REVERSING SHAFT ASSEMBLYSection LXXVII. CRANE VERTICAL REVERSING SHAFT ASSEMBLYSection LXXIX. CRANE VERTICAL SWING SHAFT ASSEMBLYCrane Vertical Swing Shaft Assembly Cleaning, Inspection, and RepairSection LXXXI. CRANE ROTATING FRAME BASE ASSEMBLYFigure 289. Crane auxiliary shaft assembly.Section LXXXII. ROTATING FRAME RING GEARSection LXXXIII. CRANE GANTRY FRAMEChapter 5. DEMOLITION, SHIPMENT AND LIMITED STORAGEFigure 292. Placement of charges.Other Demolition MethodsLoading Equipment for Shipment - TM-5-3810-227-150357Inspection and Maintenance of Equipment in Storage - TM-5-3810-227-150358Appendix I. REFERENCES - TM-5-3810-227-150359Appendix I. REFERENCES - continuedAppendix II. MAINTENANCE ALLOCATIONSection II. MAINTENANCE ALLOCATION CHART - TM-5-3810-227-150362Section II. MAINTENANCE ALLOCATION CHART - continued - TM-5-3810-227-150363Section II. MAINTENANCE ALLOCATION CHART - continued - TM-5-3810-227-150364Section II. MAINTENANCE ALLOCATION CHART - continued - TM-5-3810-227-150365Section II. MAINTENANCE ALLOCATION CHART - continued - TM-5-3810-227-150366Section II. MAINTENANCE ALLOCATION CHART - continued - TM-5-3810-227-150367Section II. MAINTENANCE ALLOCATION CHART - continued - TM-5-3810-227-150368Section II. MAINTENANCE ALLOCATION CHART - continued - TM-5-3810-227-150369Section II. MAINTENANCE ALLOCATION CHART - continued - TM-5-3810-227-150370Section II. MAINTENANCE ALLOCATION CHART - continued - TM-5-3810-227-150371Section II. MAINTENANCE ALLOCATION CHART - continued - TM-5-3810-227-150372Section II. MAINTENANCE ALLOCATION CHART - continued - TM-5-3810-227-150373Section II. MAINTENANCE ALLOCATION CHART - continued - TM-5-3810-227-150374Section II. MAINTENANCE ALLOCATION CHART - continued - TM-5-3810-227-150375Section II. MAINTENANCE ALLOCATION CHART - continued - TM-5-3810-227-150376Section II. MAINTENANCE ALLOCATION CHART - continued - TM-5-3810-227-150377Section II. MAINTENANCE ALLOCATION CHART - continued - TM-5-3810-227-150378Section II. MAINTENANCE ALLOCATION CHART - continued - TM-5-3810-227-150379Section II. MAINTENANCE ALLOCATION CHART - continued - TM-5-3810-227-150380Section II. MAINTENANCE ALLOCATION CHART - continued - TM-5-3810-227-150381Section II. MAINTENANCE ALLOCATION CHART - continued - TM-5-3810-227-150382Section II. MAINTENANCE ALLOCATION CHART - continued - TM-5-3810-227-150383Section II. MAINTENANCE ALLOCATION CHART - continued - TM-5-3810-227-150384Appendix. III. BASIC ISSUE ITEMS LIST AND MAINTENANCE AND OPERATING SUPPLIESFigure 293. Basic issue items.Section II. BASIC ISSUE ITEMS LIST - TM-5-3810-227-150387Section II. BASIC ISSUE ITEMS LIST - continued - TM-5-3810-227-150388Section II. BASIC ISSUE ITEMS LIST - continued - TM-5-3810-227-150389Section II. BASIC ISSUE ITEMS LIST - continued - TM-5-3810-227-150390Section III. MAINTENANCE AND OPERATING SUPPLIES - TM-5-3810-227-150391Section III. MAINTENANCE AND OPERATING SUPPLIES - TM-5-3810-227-150392Section III. MAINTENANCE AND OPERATING SUPPLIES - TM-5-3810-227-150393TM-5-3810-227-15 Crane-Shovel Basic Unit Truck Mounted: 20 Ton 3/4 Cu.Yd. Gasoline Engine 6x6 Manual