• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Fig. 16 - Lifter Bracket Bolt Tightening Sequence
VALVE AND INJECTOR OPERATING MECHANISM

Maintenance Manual For Crane, Truck Mounted Hydraulic 25 Ton (CCE) - Vol 3 Page Navigation
  31    32    33    34    35  36  37    38    39    40    41  
img
. .
TM 5-3810-300-24&P-3
1.2 Cylinder Head
housing to the water manifold with four bolts and lock
26. Refer to Section 13.1
under Preparation for
washers.
Starting Engine First Time and fill the cooling system
and lubrication system.
24. Install the hose between the thermostat housing
outlet elbow and the radiator and secure it with two
27. Before starting the engine, perform an engine tune-
clamps.
up as outlined in Section 14.
25. Install any other equipment or parts that were
previously removed.
Page 40


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.