BOOM HOIST PAWLS
SUBSECTION 8F
approximately 2-1/16 inches. Adjust to this dimension
ened securely. Also, be sure all cotter pins are installed in
by means of the adjusting nut "A", if necessary. Refer to
their required places.
the note in step 2C if any adjustment was made.
5. Check for secure installation of the machine screws
holding clamp (03) and the pawl end of cable (31).
B. The boom hoist drum pawl must clear the ratchet teeth
6. Start the engine and operate the boom hoist controls.
by a minimum of 1/8 inch. Adjust to this dimension by
Check the operation of the pawls and brakes. Make certain
means of adjusting nut "A" if necessary. Refer to the
they are operating properly before lifting the boom or any
note in step 2C if any adjustment was made.
loads.
4. Check that all jam nuts on cables and yokes are tight-
7. Replace the panel and shroud if removed for overhaul.
8F-5