TM 5-3810-307-24-1-1
5.
Install the two hex head bolts and washers
weldment of the cable follower, if provided, and
securing the angle to the roller assembly and
install the lever weldment with the hardware
completely fill the roller assembly with grease
provided.
through the grease fitting on the end of the shaft.
11. Install the end of the idler shaft through the
6.
Install the two bearings in the idler drum and
hole provided in the top of the side plate.
ensure they are fully seated.
12. Install the end cap, bolt, and lockwasher
7.
Install the left hand side plate over the arm
securing the idler shaft to the side plate.
weldment of the cable follower, if provided, and
install the lever weldment with the hardware
Installation.
provided.
1.
Using a suitable lifting device, align the holes
8.
Install the idler shaft through the hole provided
in the side plates with those provided on the hoist
at the top of the side plate.
and secure with the existing hardware.
9.
Install the idler drum assembly over the shaft
2.
Install the tension springs and adjust the
and completely fill the drum assembly with grease
springs to provide equal tension across the roller
through the grease fitting on the end of the shaft.
assembly.
10.
Install the right hand side plate over the arm
3.
Refer to Chapter One, Section 4 -
LUBRICATION and lubricate the cable idler drum
and follower as specified.
2-11-11