Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
Lead Tower Disassembly
Load the Shipping/Storage Container
TM-5-3810-307-10 All-Terrain Crane (ATEC) AT422T Diesel Engine Driven 22 Ton Capacity Truck Mounted With CAB Manual
Page Navigation
370
371
372
373
374
375
376
377
378
379
380
TM
5-3810-307-10
STEP
1
Impact
Hammer
15-Foot
Lead
Section
Bolts
at
this
End
Lead
w/ Five
Wood
Blocks
Head
Pile
Gate
Stacked
Under
Each
Adapter
18-inch
End
Square
(Concrete)
Pile
Adapter
TEMPLATE
ONLY
12-inch
16-inch
Plywood
10-inch
Two
15-Foot
Lead
Sheet
Foot
Bolts
Guide
Guide
Template
for
Guide
Pile
Roller
at
Sections
w/
One
Plate
Plate
Plate
Adapter
this
18-inch
Square
Wood
Block
Stacked
End
(Concrete)
Pile
Between
Sections
at
Adapter
Each
End
STEP
2
Pile
Gate
Stop
and
Impact
Hammer
Stop
(Place
in
Adapter)
Spotter
Lead
Remove
Spotter
Transportation
TOOL
BOX
TOOL
BOX
Slide
and
Place
in
(ACCESSORIES)
(SPARE
PARTS)
Chain
(Place
in
Adapter
Adapter)
Spotter
Storage
Large
Tools
are
Bundled
Support
to be
Together
and
Secured
in
Placed
on
Lead
the
Shipping/Storage
Tower
Sections
Container
at
End
of
Rough
Terrain
Rough
Terrain
First
Assembly
Dolly
Wheel
Dolly
Wheel
Figure
H-21.
Shipping/Storage
Container
Arrangement
Change
1
H-87
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business