TM 10-1670-295-23&P2-30. Buffer.This task covers:a.Inspectb.Repairc.ReplaceTools:Equipment Condition:Knife, item 3, Appendix BLaid out on work table.Knife, Hot Metal, item 4, Appendix BShears, item 9, Appendix BSewing Machine, Heavy Duty, item 12, Appendix BYardstick, item 15, Appendix BMaterials/Parts:Webbing, Cotton, item 19, Appendix DThread, Nylon, Size 3, item 14/15, Appendix Da.Inspect. Refer to paragraph 2-8 for inspection procedures.NOTERepair of buffer is accomplished at direct support (DS) maintenance level only, inaccordance with the Maintenance Allocation Chart (MAC), Appendix B.b.Repair. Repair buffer by restitching using heavy duty sewing machine and size 3 thread. Stitch overoriginal pattern. Lock each row ½ Inch at each end.c.Replace. (figure 2-21).(1)Remove buffer (1) by cutting stitching.(2)Cut a 15-inch and 16-inch lengths of cotton webbing.(3)Position the 15-inch webbing on the Inside and the 16-inch webbing on the outside of liftinglegs.(4)Using a heavy duty sewing machine and size 3 nylon thread stitch webbing with a 2 inch boxstitch and each end.Figure 2-21. Buffer Replacement.2-35
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business