Figure 2-3. Front end attachments loaded and blocked for shipment (sheet 1 of 2).
(c) Perform steps (1) and (2) of b above.
2-6, move basic unit into position and connect boom by
installation of two boom foot pins. Install pins with head
(d) Perform
preventive
maintenance
out and secure each with a cotterpin. Complete crane
installation as follows:
(e) Assure that crane-shovel has been
inspected and serviced (para 2-1) then start engine
reeve boom hoist cable, connect cable to dead end
socket and secure with cable clamps.
suitable area near by where selected front end
attachment, may be installed.
reeve main hoist cable through hook block, connect to
c. Setting Up Instructions for Crane Operation.
dead end socket, and secure with cable clamps.
(1) Description. The equipment required for
(c) Raise boom to operating position and
crane operation consists of a 50 foot boom, boom
backstop, ,boom hoist guy cables, boom hoist cable,
(d) When jib boom is required, install as
snatch block, hook block, boom angle indicator, and
room harness spreader (cross-over).
(2) Crane front end attachment installation.
With crane boom cribbed as illustrated in figure
2-4