Figure 2-8. Crane front end attachment, with jib boom installed.
(e) Remove clamps from digging cable
(i)
Install crane front end attachment
(view C) at dead end socket, then slowly rewind cable
on drum as it is carefully guided through the sheaves.
f. Shovel Front End Attachment. Installation of
(f) Remove clamps from hoist cable
(view B) at dead end socket, then slowly rewind on drum
assistance of organizational maintenance personnel,
as it is carefully guided through the sheaves.
and in case the crowd chain mechanism is not installed
(g) Remove cotterpins from boom foot
on boom foot, the assistance of direct support
maintenance personnel as well. Installation instructions
gantry, then back basic unit away from backhoe front
end attachment slowly until machine is clear.
(h) Remove cables from drums (views A,
3-131); install crane lagging, then install crane cables
2-10