b. Cleaning and Inspection.
(1) Clean all parts and dry thoroughly
(2) Inspect for cracks or other defects.
Replace defective parts as required.
c. Reassembly and Installation.
(1) Reassemble heater as illustrated in figure
4-140.
4-156. Carrier Cab Heater
a. Removal and Disassembly.
(2) Remove heater as illustrated in figure 4-
141.
Figure 4-141. Carrier cab heater, removal and
installation
.
4-143