TM 5-3810-289-12
D. DUMPING THE BUCKET
C. SWINGING THE MACHINE
STEP 6.
DUMP THE BUCKET BY RELEASING THE
STEP 5.
SWING THE MACHINE (FIGURE 2-42)
DRAG BRAKE.
WHEN THE LOAD IS
TO THE DUMPING AREA.
DUMPED RETURN TO DIGGING AREA.
ME 3810- 28-12/2-45 (
Figure 2-45. Operating the dragline (sheet 2 of 2).
2-52