• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CCE MANUFACTURER FIELD CAMPAIGNS AND MODIFICATION PROCEDURES
Maintenance code

Operator's Manual For Crane, Truck Mounted, Hydraulic 25 Ton (CCE) Page Navigation
  128    129    130    131    132  133  134    135    136    137    138  
img
. . . .
TM 5-3810-293-14&P-1
APPENDIX 2-C
BASIC ISSUE ITEM LIST AND ITEMS
TROOP INSTALLED OR AUTHORIZED
Section I. INTRODUCTION
1.
Scope
This appendix lists basic issue items, items troop installed or authorized which accompany the CCE Crane, and required
by the crew/operator for operation, installation, or operator's maintenance.
2.
General
This basic issue items, items troop installed or authorized list is divided into the following sections:
a. Basic Issue Items List - Section II. A list, in alphabetical sequence, of items which are furnished with and which
must be turned in with the end item.
b. Items Troop Installed or Authorized List - Section III. A list, in alphabetical sequence of items which at the
discretion of the unit commander may accompany the end item, but are NOT subject to be turned in with the end item.
3.
Explanation of Columns
The following provides an explanation of columns in the tabular list of Basic Issue Items List, Section II, and Items Troop
Installed or Authorized, Section III.
a. Source, Maintenance, and Recoverability Code(s) (SMR):
(1)  Source Code, indicates the source for the listed item. Source codes are:
Code
Explanation
P
Repair parts, special tools and test equipment supplied from GSA/DSA or Army Supply System and
authorized for use at indicated maintenance levels.
P2
Repair parts, special tools and test equipment which are procured and stocked for insurance purposes
because the combat or military essentiality of the end item dictates that a minimum quantity be
available in the supply system.
3-2-35


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.