• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
TELESCOPING THE BOOM.
PRELOAD OPERATION CHECK.

Operator's Manual For Crane, Truck Mounted Hydraulic 25 Ton (CCE) Page Navigation
  122    123    124    125    126  127  128    129    130    131    132  
img
Proper Boom Telescoping.
LOWERING AND RAISING THE CABLE.
CAUTION
WHEN STARTING OR STOPPING HOIST, DO NOT JERK CONTROL LEVER.  JERKING LEVER
CAUSES LOAD TO BOUNCE,WHICH COULD RESULT IN POSSIBLE DAMAGE TO MACHINE.
NOTE
CONTROL LEVER DISTANCE FROM NEUTRAL (CENTER) DETERMINES HOIST LINE SPEED.
WHEN LOAD IS STOPPED AT DESIRED HEIGHT, THE AUTOMATIC BRAKE WILL ENGAGE AND
RETAIN LOAD AS LONG AS CONTROL LEVER REMAINS IN NEUTRAL.
WARNING
BEFORE LOWERING OR RAISING CABLE (LOAD) ASSURE THAT AREA BENEATH LOAD IS CLEAR
OF ALL OBSTRUCTIONS AND PERSONNEL.
47


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.