CAUTION
BEFORE INITIATING STOWING OPERATIONS, ASSURE THAT ALL SPIN-LOCKS ARE ALL THE WAY
UP.
Stowing the Outriggers. To stow the outriggers, first the applicable outrigger control button(s) is/are
depressed, then the MAIN OUTRIGGER CONTROL switch is positioned to RETRACT.
CONTROL LEVER OPERATION.
Control lever operation for crane functions is standard, i.e., the closer the lever is to neutral (center), the
slower the system operates and the further the control is from neutral the faster the operation.
To provide multiple crane function capability, foot treadles are integral with swing and boom control levers.
43