• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Swingaway Boom Extension
COUNTERWEIGHT REMOVAL.

Operator's Manual For Crane, Truck Mounted Hydraulic 25 Ton (CCE) Page Navigation
  128    129    130    131    132  133  134    135    136    137    138  
Stowing 32 Ft. Swingaway Extension. Stow 32 ft. swingaway extension in accordance with the
following procedure.
.1.
Retract, swing and lower boom over rear of carrier below horizontal (-4 degrees).
2.
Remove hook from cable; remove cable from jib and stow dead head.
3.
Remove safety pins from jib attach pins on left side of boom nose; remove attach pins.
4.
Elevate boom to horizontal, and swing jib around to right side of boom base section.
5.
Secure jib to main bracket with attach pins; secure attach pins with safety pins.
6.
Remove safety pins from jib attach pins on right side of boom nose, remove and stow attach pins.
7.
Push jib tip against boom base; engage aft bracket and latch. Jib is now stowed.
8.
Rig boom nose as desired.
53


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.