• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
COUNTERWEIGHT INSTALLATION.
LUBRICANTS

Operator's Manual For Crane, Truck Mounted Hydraulic 25 Ton (CCE) Page Navigation
  132    133    134    135    136  137  138    139    140    141    142  
CRANE TRAVELING.
PREPARATION FOR TRAVEL.
1.
Fully retract the boom and firmly position it in the boom rest.
2.
Engage the swing (house) lock.
3.
If the machine is rigged, attach the hook block to the snubber line attached to the carrier tow rings.
4.
Tighten the cable sufficiently to prevent excessive hook and cable movement during travel.
NOTE
DO NOT TRAVEL WITH THE HOOK IN A POSITION WHERE IT CAN SWING FREELY.
5. Fully retract the outrigger jacks and beams.
6. Remove the jack floats. Stow and secure.
7. Make the final inspection to make certain no loose equipment has been overlooked. Close and
secure all compartments.
CAUTION
PUMP DRIVE MUST ALWAYS BE DISENGAGED BEFORE TRAVEL.
57


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.