• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Install Air System - Continued
Clutch

Maintenance Manual For Crane, Truck Mounted Hydraulic 25 Ton (CCE) Page Navigation
  198    199    200    201    202  203  204    205    206    207    208  
img
If so equipped, attach the countershaft brake control
valve and clamp to the shift lever and secure the valve
by tightening the screw on the clamp.
Attach the black 1/8" OD brake control air line to the
elbow fitting on the front of the valve and attach the
white air line to the fitting on the bottom of the valve.
Attach the black 1/8" OD air line to the TCB-6
countershaft brake located on the right PTO opening.
Attach the white  1/8" OD air line to the tee block
between the air filter and regulator.
4-219


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.