TM 5-3810-302-10
Always refer to the capacity on the load chart in the cab BEFORE making
any lift. Position the hoist line to the radius required - then lift the load.
Stay within the approved work area for the load being lifted.
Remember - all rigging equipment must be considered as part of the load.
Lifting capacities vary with working areas. Permissible working areas are
posted in the crane cab. When swinging from one working area to another,
ensure load chart capacities are not exceeded. Know your crane!
Operate the engine at or near governed RPM during performance of all crane
operations.
2-17