TM5-3810-305-10RailTransportPreparethe LRT 110 Crane for rail transport as follows:1.2.3.4.Weight of the hook block isapproximately 235 lb (107 kg).Use adequate lifting equipmentand properly support the hookblock. Do not lift over personnalor let personnel walk underneathsuspended. Failure to follow thisprocedure could cause DEATHor serious injury.Using hoist and sling, remove the hook blockfrom cable. Store it in the tool box and blockit to prevent it from moving.Retract the boom and lower it over the front.Wind cable back on drum, and wire socketdown to prevent cable from loosening onwinch drum.Install a 1/2 in. 6x19 IWRC cable around loadsheave and hook block tieback.Refer to TM55-3810-165-14 TransportabilityGuidance for the Crane, 7.5 Toni RoughTerrain. Koehring, Type 1, {NSN 3810=01-165-0646}, Type 2, {NSN 3810-01-165-0467}and the shipping data plates for tiedownrequirements.5. Place the fuel shut-off on the rear wall of cab6.7.in the off position. Put the transmission shiftlever in center (neutral) position, and releasethe parking brakeRemove all loose tools and equipment fromthe operator’s cab. Stow and secure all toolsand equipment in the tool box.Band the tool and battery box lids shut.5-49
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business