TM5-3810-305-10f.g.h.Start engine.Swing boom to 2 o’clock position andstow mast (3) on upperstructure storagelocation D (Figure 5-4) using additionalpin from tool box.Shut engine off.3. Account for and clean all tools used in assem-bly procedures. Put away all tools in toolbox.Lower the LRT 110 Crane to the Ground1.2.3.CAUTION When attaching hook block tohook block tieback, take up cableslowly while lowering boom toprevent damage to windshield.Start engine. Center boom over cab and raiseboom to a 50-degree angle. Lower hookblock down far enough to hook it into hookblock tieback on front of the LRT 110 Crane.Lower boom to travel position while takingup slack in cable.Raise outriggers, lowering the crane toground. Retract outrigger beams up to travelposition. Shut engine off.Recheck stowage of all items used for assem-bly of the LRT 110 Crane, The crane is nowready for normal operation.Figure 5-4. StorageLocationD5-44
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business