TM5-3810-305-10CHAPTER 4OPERATING INSTRUCTIONS AND FUNCTIONSThe purpose of this chapter is to familiarize the operator with controls and instruments necessary for theoperation of the LRT 110 Crane. Included also are the Preventive Maintenance Checks and Services(PMCS) and vehicle operating procedures.Do not attempt to operate the LRT 110 Crane until all operating instruc-SectionIIIIIIIVVtions have been read and understood. Knowledge of controls alone isinadequate preparation to operate this vehicle. Failure to follow thisprocedure could cause DEATH or serious injury.TitleUse of Operator’s Controls and IndicatorsControls and InstrumentsInitial Adjustments and Control SettingsChecks and InspectionsOperator ObservationsCable InspectionPreventive Maintenance Checks and Services (PMCS)Operator Troubleshootingstart-upStarting the EngineOperation Under Normal ConditionsOperating the EngineBefore Moving the LRT 110 CranePre-Move ChecklistMoving the Vehicle to a Job SiteUpshifting and Downshifting RecommendationsStopping the EngineLift Procedure on OutriggersLift Procedure “On Tires”Hand Signals for LRT 110 Crane OperationWire Rope InstructionsWire Rope Identification and ConstructionWire Rope InstallationUnreeling and UncoilingSeizing Wire RopeCutting Wire RopeEnd Fittings and/or AttachmentsSocketingWire Rope ClipsU-Bolt ClipsFist Grip ClipsPage4-34-104-114-124-134-154-174-184-184-184-184-204-204-204-254-274-284-304-314-344-354-354-364-374-384-394-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business