TM5-3810-305-10
CHAPTER 4
OPERATING INSTRUCTIONS AND FUNCTIONS
The purpose of this chapter is to familiarize the operator with controls and instruments necessary for the
operation of the LRT 110 Crane. Included also are the Preventive Maintenance Checks and Services
(PMCS) and vehicle operating procedures.
Do not attempt to operate the LRT 110 Crane until all operating instruc-
Section
I
II
III
IV
V
tions have been read and understood. Knowledge of controls alone is
inadequate preparation to operate this vehicle. Failure to follow this
procedure could cause DEATH or serious injury.
Title
Use of Operators Controls and Indicators
Controls and Instruments
Initial Adjustments and Control Settings
Checks and Inspections
Operator Observations
Cable Inspection
Preventive Maintenance Checks and Services (PMCS)
Operator Troubleshooting
start-up
Starting the Engine
Operation Under Normal Conditions
Operating the Engine
Before Moving the LRT 110 Crane
Pre-Move Checklist
Moving the Vehicle to a Job Site
Upshifting and Downshifting Recommendations
Stopping the Engine
Lift Procedure on Outriggers
Lift Procedure On Tires
Hand Signals for LRT 110 Crane Operation
Wire Rope Instructions
Wire Rope Identification and Construction
Wire Rope Installation
Unreeling and Uncoiling
Seizing Wire Rope
Cutting Wire Rope
End Fittings and/or Attachments
Socketing
Wire Rope Clips
U-Bolt Clips
Fist Grip Clips
Page
4-3
4-10
4-11
4-12
4-13
4-15
4-17
4-18
4-18
4-18
4-18
4-20
4-20
4-20
4-25
4-27
4-28
4-30
4-31
4-34
4-35
4-35
4-36
4-37
4-38
4-39
4-1