TM 5-3810-307-24-1-1
Installation
a.
If removed, install tagline assembly on hydraulic hoses (7, Figure 2-10-6), refer to TAGLINE ASSEMBLY
Installation procedures.
b.
If removed, remove caps and install hydraulic hoses (1 and 7) on hose reel assembly (6).
c.
With hose reel assembly (6) on an elevated platform, lower boom to align hose reel assembly mounting
holes with boom mounting bracket.
NOTE
If necessary, install shim washer(s) as marked during removal.
d.
Secure hose reel assembly (6) to boom with capscrews (5), lockwashers (4), and nuts (3).
e.
Remove caps and connect hydraulic hoses (1) to connectors (2).
f.
Preload hose reel spring by rotating hose reel assembly (6) clockwise seven turns, then maintain tension
by attaching tagline clips to stowage link on boom.
g.
Attach hoses (7) and taglines to attachment as necessary.
2-10-20