TM 5-3810-307-24-1-1
7.
Prepare the boom for shipment by taping the boom hose reel hoses to the lower boom nose sheave shaft.
8.
Fold both hoist mirrors down against boom.
9.
Prepare the carrier cab for shipment as follows:
(a)
Cushion and tape the defroster fan.
(b)
Tape fire extinguisher in its bracket.
(c)
Tape both sliding windows closed.
(d)
Fold mirrors (on cab and on carrier right side) in toward crane.
10.
Ensure battery disconnect is in off position.
WARNING
The diesel fuel is flammable. Do not smoke or use open flame when
draining the fuel tank. Flames and explosion could result in severe personal
injury or death.
11.
Drain the fuel tank.
12.
Preserve the crane in accordance with MIL-STD-162, Preparation for Shipment, Storage Cyclic
Maintenance of Material Handling Equipment (Level A).
2-16-3/(2-16-4 Blank)