• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Throttle Control Cylinder - Cutaway
PRESSURE PROTECTION VALVE

Maintenance Manual For All-Terrain Crane (ATEC) Diesel Driven, 22 Ton - Vol 1 - Pt2 Page Navigation
  172    173    174    175    176  177  178    179    180    181    182  
SM07-008-0
Page 5/(6 Blank)
2.
Install the U-cup seal (13) and the wear ring (12)
5.
Insert the piston assembly into the body (15).
on the piston (16).
6.
Install the O-ring seal (14) into the body cavity.
3.
Slide the piston (16) in to the cylinder shell (18).
7.
Install the cover (1) and the screws (5) torquing
4.
Install the capscrew (11) through the piston (16)
them 28 to 34 pounds-inch (32.2 to 39.1 kgcm).
and install the piston sleeve (4) and the springs (17
and 21).
8.
Install the dust boot (3).


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.