• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
THEORY OF OPERATION
HOLDING VALVE

Maintenance Manual For All-Terrain Crane (ATEC) Diesel Driven, 22 Ton - Vol 1 - Pt2 Page Navigation
  208    209    210    211    212  213  214    215    216    217    218  
img
SM08-018-0
Page 4
1.
Coat the spool with clean hydraulic oil and in-
4.
Install the 0-ring onto the plunger.
stall the spool into the valve body.
5.
Install the sleeves and spring onto the plunger
2.
Install the washers and springs onto each end
and install the plunger assembly into the coil.
of the spool.
6.
Install the solenoid assembly onto the valve
3.
Install the 0-ring on the plug or plate and install
body and secure it in place using the four screws.
onto the base of the valve. If a base plate is used,
secure the plate using the four screws.
7.
Install the fittings into the solenoid valve.
NOTE
The longer sleeve on the solenoid as-
sembly is always positioned on the top
side of the plunger.


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.