• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Water Pump Replacement - Continued
Water Pump Replacement - Continued

Maintenance Manual For All-Terrain Crane (ATEC) Diesel Driven, 22 Ton - Vol 2 - Pt1 Page Navigation
  110    111    112    113    114  115  116    117    118    119    120  
img
TM 5-3810-307-24-2-1
Lift the tensioner arm and pulley to install the drive belt.
CAUTION
The system must be filled properly to prevent
air locks. During filling, air must be vented
from the engine coolant passages. Be sure to
open the petcock on the aftercooler for
aftercooled engines.
The system has a design fill rate of 19 liters per minute
[5 U.S. gallons per minute]. Do not exceed this fill rate.
Wait 2 to 3 minutes to allow air to be vented. Then add
coolant to bring the level to the top.
A-11 C-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.