• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Intake Manifold Temperature - Check
Turbocharger - Replacement - Continued

Maintenance Manual For All-Terrain Crane (ATEC) Diesel Driven, 22 Ton - Vol 2 - Pt1 Page Navigation
  158    159    160    161    162  163  164    165    166    167    168  
img
.
TM 5-3810-307-24-2-1
Apply 276 kPa [40 psi] of air pressure to the cooler. If
the pressure drop is 35 kPa [5 psi] or less in 15
seconds, the cooler is okay.
If the pressure drop is greater than 35 kPa [5 psi] in
15 seconds, the charge air cooler must be repaired
or replaced. Refer to the CAC manufacturer for repair
instructions.
NOTE
A leak tank can be used to locate the air
leak.
Turbocharger - Replacement
Preparatory Steps:
Remove the air crossover tube.
Disconnect the intake and exhaust piping.
A-59 C-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.