• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Expansion and Installation - Continued
Dipstick Tube - Replacement (1-09)

Maintenance Manual For All-Terrain Crane (ATEC) Diesel Driven, 22 Ton - Vol 2 - Pt2 Page Navigation
  128    129    130    131    132  133  134    135    136    137    138  
img
TM 5-3810-307-24-2-2
Apply a bead of Loctite 609 to the edge of the bushing
that will be installed to the rear of the bore. Apply the
Loctite to 270 degrees of the diameter of the bushing,
see the illustration. Use care to not apply Loctite near
to or in line with the oil hole.
Universal Bushing Installation Tool
Install the camshaft bushing flush with the block.
Be sure the oil hole is aligned.
A 3.2mm [0.126 in] diameter rod must be able to pass
through the hole.
Measure the installed camshaft bushing.
Camshaft Bushing Bore
mm
in
54.107
MIN
2.1302
54.146
MAX
2.1317
1-24


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.