• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Connecting Rod - Inspection (1-28)
Piston Ring Gap - Checking (1-31)

Maintenance Manual For All-Terrain Crane (ATEC) Diesel Driven, 22 Ton - Vol 2 - Pt2 Page Navigation
  148    149    150    151    152  153  154    155    156    157    158  
img
.
TM 5-3810-307-24-2-2
Bearing clearance can also be determined with
plastigage during engine assembly.
Piston  and  Connecting
Rod
-
Assembly (1-30)
Be sure "front" marking on piston and the numbers
on the rod and cap are oriented as illustrated.
NOTE
The numbers shown in the illustration are for
example purposes only.
Install the retaining ring in the pin groove on the
"front" side of the piston.
Lubricate the pin and pin bores with engine oil.
1-44 C-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.