TM 10-1670-295-23&P2-24. Coupler LinkThis task covers: a.Inspectb.ReplaceTools:Equipment Condition:Punch, Item 8, Appendix BOn work table.Hammer, Item 17, Appendix Ba.Inspect.Refer to paragraph 2-8 for inspection procedures.b.Replace. (figure 2-13).(1)Using punch remove pin (1) from coupling link (2).(2)Separate and remove the coupling link half (2) and spacer (3).(3)Remove chain from coupling link.(4)Remove remaining coupler link half (2).(5)Install new coupler link half (2) on grabhook (4).(6)Attach chain to new coupler link half.(7)Position spacer (3) and remaining half of coupler (2), and slide pin (1) into place on grabhook(4).Figure 2-13. Coupler Link Replacement.2-26
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business