Home
Download PDF
Order CD-ROM
Order in Print
Figure 4-39. Cylinder head bolt tightening sequence.
Section XIII. TRANSMISSION MAINTENANCE
TM-10-3950-206-12 Crane Truck Warehouse 10 000 Lb. Capacity GED PT Pettibone Model 10FM Manual
Page Navigation
59
60
61
62
63
64
65
66
67
68
69
TM
10-3950-206-12
1.
Intake
Manifold
6.
Stud
(4)
11.
Gasket
2.
Plug
7.
Gasket
12.
Stud
(11)
3.
Plug
(6)
8.
Exhaust
Manifold
13.
Washer
(3)
4.
Nut
(11)
9.
Washer
(4)
5.
Washer
(8)
1t0.
Nut
(4)
Figure
4-40.
Exhaust
and
Intake
Manifolds
,
exploded
view.
4-44