TM 5-3810-207-20/TO 36C23-3-37-12
Section V. CARRIER FRAME
310. General
The carrier frame is an all welded-steel structure with
crossmembers, supporting brackets, and front outrigger
frame welded integrally with the frame. The rear
outrigger assembly is mounted at the back of the frame
and is removable. The carrier frame supports and
carries the crane and all components. A pintle hook is
mounted on the rear outrigger assembly for towing
purposes.
311. Pintle Hook
a.
Removal and Disassembly. Remove and
disassemble the pintle hook in the numerical sequence
as instructed on figure 192.
b.
Cleaning, Inspection, and Repair.
(1) Clean all parts with an approved
cleaning solvent.
(2) Inspect all parts for defective conditions.
(3) Repair or replace damaged parts as
necessary.
c.
Reassembly and Installation. Reassemble
and install the pintle hook in the reverse of the
numerical sequence as illustrated on figure 192.
312. Rear Outrigger Assembly
a.
Removal.
(1) Remove the floats from the rear
outrigger assembly (TM 5-3810-207-10).
(2) Remove the rear outrigger assembly
from the frame (TM 53810-207-10).
b.
Disassembly.
Disassemble
the
rear
outrigger assembly and the front outrigger beams as
instructed on figure 193.
c.
Cleaning, Inspection, and Repair.
(1) Clean all parts with an approved
cleaning solvent.
(2) Inspect all parts for defective conditions
(3) Repair or replace damaged parts as
necessary.
d.
Reassembly.
Reassemble
the
front
outrigger beams and the rear outrigger assembly as
illustrated on figure 193.
e.
Installation.
(1) Install the rear outrigger assembly on
the carrier frame (TM 53810-207-10).
(2) Install the floats on the rear outrigger
assembly (TM 53810-207-10).
248