(2) Install light assembly, and connect
assembly with nuts.
electrical leads.
g. Carrier Trouble Light and Reel Assembly (Model
(2) Install light assembly and connect
electrical leads.
2385).
Figure 2-8. Carrier trouble light and reel assembly (model 2385).
Section II. MOVEMENT TO A NEW WORKSITE
b. Preparation for Movement.
2-3. Dismantling for Movement
(1) Retract and stow the outriggers or remove
the stabilizer wedges.
a. General The crane may be moved to a new
(2) Secure the utility blade with the blade latch
work- site by driving under its own power or by towing.
as shown in figure 2-9, or use the utility blade brace (only
NOTE
Before moving the equipment over the
road, obtain information on road
conditions and possible restrictions
along the route.
2-9