TM 5-3810-289-12
15
X
CRANE-SHOVEL
If the crane operates unusually or develops an un-
Para 2-13
usual noise, stop the machine and check it.
16
X
When starting the crane-shovel, see that all control
Para 2-11
AND CLUTCH
levers are in neutral position and the engine clutch
LEVER
lever is in neutral position.
17
X
TOOLS AND EQUIP-
Make sure all tools and equipment assigned to the
MENT
unit are in serviceable condition, clean, and properly
stowed or mounted.
18
X
LIGHTS
Clean and check all lights for proper operation if the
equipment is to be used at night.
19
X
TRACK ASSEMBLY
Check the train tension.
Para 3-22
9
CRANE-SHOVEL
OPERATIONAL TEST:
Para 2-13
During operational test observe for any unusual
noises or vibrations.
Note. Make all adjustments during operational test.
10
Check all gears carefully for wear or damage.
11
CHAIN DRIVES AND
Check for wear.
SPROCKETS
12
ENGINE CLUTCH
Check adjustments.
Para 4-16
13
SHEAVES AND
Check for wear or damage.
Para 4-56
14
WIRE ROPES
Check for wear or damage.
Para 4-54
15
VALVES
Check valve adjustments.
Para 4-13
3-5