• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2-16. Jib Storage (911J90-E)
Figure 2-18. Manual Fly Section (105JB81)

Operator's Manual For Crane, Truck Mounted, Hydraulic 25 Ton (CCE) Page Navigation
  24    25    26    27    28  29  30    31    32    33    34  
img
.
SECTION II
CONTROLS AND OPERATION
Figure 2-17. Jib Suspension (911J91)
1. Rotate the upper so that the boom is over either side
5. Remove the winch line from becket (11) and attach it
of the rear of the carrier. Do not attempt to fold the jib
to becket (4). Slowly lower the boom and take up slack
with the boom over the front of the carrier.
in the line with the winch to fold the jib under the boom.
6. Telescope the boom back fully, and take up slack with
2. Remove the hook block from the main or auxiliary
the winch until the jib mount bracket is aligned with the
winch line, and attach the line to becket (11). Take up
jib  mounts.
Install  spacers  (8),  retainers  (7),
on the winch  line to relieve the tension on the jib
lockwashers (6), and capscrews (5).
suspension cable.
7. Install pin (10) and lock it in place with cotter pin (9).
3. Remove the suspension cable from the boom point
and attach it to the bracket at the base of the jib as
8. Unhook the winch line from becket (4) and attach the
shown in Figure 2-16. Elevate the boom to an angle of
line to the hook block.
approximately 45 degrees, and pay out line from the
winch slowly, until the jib is suspended vertically from the
9. Remove "T" pins from boom jib pivot point and install
boom point.
in stowed position.
4. Telescope the boom back, leaving approximately one
foot of boom extended.
Change 1 1-2-25


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.