Figure 7-5. Outrigger Extension Cylinder (10053305)
OUTRlGGER SYSTEM

Operator's Manual For Crane, Truck Mounted, Hydraulic 25 Ton (CCE) - Vol 2 Page Navigation
  214    215    216    217    218  219  220    221    222    223    224  
img
SECTlON VII
OUTRIGGER SYSTEM
2. Install back-up ring (13) and O-ring (12) in the groove
8. Remove wiper ring (8) from the stuffing box.
on the outside diameter of the stuffing box. Place the
9. Remove O-ring (12) and back-up ring (13) from the
back-up ring on the side away from the pressure.
stuffing box.
3. Lubricate inside diameter of pecking end wiper ring (8)
with clean hydraulic oil.
INSPECTION. Inspect rod and cylinder bore for excessive
wear, nicks or scratches. If either of these pans are
4. Slide cartridge nut (5) onto the rod.
demaged, the entire cylinder must be replaced.
5. Install the stuffing box on rod assembly (8). Push in
ASSEMBLY. To assemble the extension cylinder, proceed
the rod eye.
a s follows:
6. Install wiper ring (8) and seal (7) onto the rod.
1. Press wiper rings (7) and (8) on the stuffing box.
Figure 7-6. Outrigger Extension Cylinder (38489 & 38491)
7-7