Home
Download PDF
Order CD-ROM
Order in Print
Shovel Conversion
Figure 2-24. Installing crowd sprocket lagging.
TM-5-3810-294-10 Crane Truck Mounted 3/4 Cubic Yards 20 Ton W/Clamshell Dragline and Backhoe Attatchments G.E.D. Manual
Page Navigation
29
30
31
32
33
34
35
36
37
38
39
Figure
2-23.
Shovel
drum
laggings.
b.
Installation.
(1)
Install
the
crowd
sprocket
lagging
on
the
front
drum
as
instructed
on
figure
2-24.
2-18