(2) Install the split rear drum lagging on the
(3) Install the crowd chain tightener
as
ME 3810-294-10/2-25
Figure 2-25. Crowd chain tightener.
(4) with the shovel boom cribbed to the height
boom foot pin holes in the boom with those in the
revolving frame.
back the truck crane to the boom and aline the
2-20