• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
WIRE ROPE
SHUTDOWN PROCEDURE.

Operator's Manual For Crane, Truck Mounted Hydraulic 25 Ton (CCE) Page Navigation
  115    116    117    118    119  120  121    122    123    124    125  
STARTING PROCEDURE.
WARNING
BEFORE STARTING ENGINE, MAKE CERTAIN TRANSMISSION IS IN NEUTRAL, BRAKE APPLIED
AND SWING (HOUSE) LOCK ENGAGED.
1.
With a cold engine, the initial start should be made from the carrier cab in accordance with the
procedures outlined in the carrier operators handbook.
2
Once the engine is warm, shut it down.
3.
Ensure the pump drive is engaged.
4.
Turn the start switch in the superstructure cab to the starting position. Release immediately when
the engine starts.
CAUTION
NEVER CRANK ENGINE FOR MORE THAN 30 SECONDS DURING AN ATTEMPTED START. IF ENG
INE FAILS TO START AFTER 30 SECONDS, ALLOW STARTER MOTOR TO COOL FOR
APPROXIMATELY TWO MINUTES BEFORE ATTEMPTING ANOTHER START.
IF ENGINE FAILS TO START AFTER FOUR ATTEMPTS CORRECT MALFUNCTION BEFORE
ATTEMPTING ANY FURTHER STARTS.
5.
After the engine has started, check the instruments for the following indications:
Oil Pressure Indicator. Normal operation 30-60 psi, within 10-15 seconds after start.
Coolant Temperature Indicator. Normal operating temperature 160F-185F (71C-85C) after
engine warm up.
Voltmeter. At least 12 volts.
CAUTION
IF OIL PRESSURE AND/OR TEMPERATURE INDICATOR(S) DO NOT DISPLAY PROPER READINGS,
SHUT DOWN ENGINE AND CORRECT MALFUNCTION BEFORE RESUMING OPERATION.
40


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.