• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Disassemble Shifting Controls. - Continued
Disassemble Shift Bar Housing.

Maintenance Manual For Crane, Truck Mounted Hydraulic 25 Ton (CCE) Page Navigation
  97    98    99    100    101  102  103    104    105    106    107  
img
TM 5-3810-300-24 & P2
2. Disassemble Gear Shift Housing Assembly.
secure the assembly upside down in a vise and remove
the tension spring by prying it up and over the spring
retainers, one coil at a time.
Remove the washer and lever from the housing.
Remove the housing from the vise and, if necessary,
remove the nut, washer, pivot pin, and O-Ring.
4-118


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.