COUNTERWEIGHT REMOVAL
Figure 4-13. Pile Driver Leads

Operator's Instructions For 40-Ton Crane Crawler Mounted Page Navigation
  38    39    40    41    42  43  44    45    46    47    48  
img
. . . .
MACHINE RIGGING
SECTION IV
TRANSPORTING CRANE
With the machine ready for transportation and lifting the
overall length is 34 feet. Overall height is 11.9 feet. The
With all boom removed from machine, the gantry lowered
shipping cubage is 4896 cubic feet and shipping weight is
and all wire rope removed from the drum the complete
74,000 pounds.
machine can be lifted using slings and tied down for trans-
portation. This is done with the crawlers installed in the
See Figure 4-11 for sling information and see Figure 4-12
retracted position.
for tie-down information.
PILE DRIVER LEADS
Figure 4-13 shows the installation and storage of the pile
The anti-rotation bar must be in place prior to
driver adapters. Use this figure to install and store the pile
lifting the machine. See Figure 4-10. The anti-
driver adapter leads.
rotation bar must remain in place during trans-
portation.
Figure 4-12. Crane Tie-Downs
4-13