Home
Download PDF
Order CD-ROM
Order in Print
Section I. INTRODUCTION
WARRANTY
Figure 1-2. Mechanical Train Schematic
Figure 1-3. Crane Terminology
TABULATED DATA
Figure 1-4. General Dimensions (2105J170)
Table 1-3. English to Metric Conversions
INTRODUCTION
TABLE 1-2. DRUM PERFORMANCE DATA
TABLE 1-2. DRUM PERFORMANCE DATA
Section II. CONTROLS AND OPERATION
Figure 2-1. Operator's Controls
IGNITION AND START SWITCH
LEFT DRUM BRAKE SWITCH
Figure 2-2. Load Weighing System
Figure 2-3 Voltmeter Operation
Figure 2-4. Planetary Lowering Lockouts
Figure 2-7. Drum Cover
PREOPERATION INSPECTION
Figure 2-8. Propelling the Machine
Figure 2-9. Axle Locking Bolts and Keepers
Figure 2-10. Liftcrane Operating Cycle
Figure 2-11. Hand Signals for Crane Operation
Figure 2-11.1. Connect Leads
Figure 2-11.3. Raising Hammer
Figure 2-12. Antifreeze Concentration and Temperature
CONTROLS AND OPERATION
Figure 2-13. Central Unit
CONTROLS AND OPERATION
Section III. LUBRICATION
Section IV. MACHINE RIGGING
Figure 4-1. Attaching Tip Section
Figure 4-2. Boom Backstop Installation (2100N509)
Figure 4-3. Boom Hoist Reeving (2105P264)
Figure 4-4. Load Line Reeving (2105N227)
Figure 4-5 Securing Rope to Drum
Figure 4-7. Gantry (2100J953)
Figure 4-8. Cast Iron Counterweight (2100J970-4)
MACHINE RIGGING
Figure 4-9. Increasing Boom Length
CRANE ATTACHMENT
COUNTERWEIGHT REMOVAL
Figure 4-12. Crane Tie-Downs
Figure 4-13. Pile Driver Leads
Section V. PREVENTIVE MAINTENANCE
PREVENTIVE MAINTENANCE
DRAIN SEDIMENT AND FILL FUEL TANK
Figure 5A-2. Air Cleaner (46Q70D1)
Figure 5A-3. Engine Turbocharger
Figure 5A-5. Clutch Lube Fittings
Construction Rope Service Record
Construction Rope Service Record - Continued
PERFORM WEEKLY AND SEMI-MONTHLY LUBRICATION
Figure 5B-2. Boom Hoist Planetary Brake Adjustment (100P632)
Figure 5B-4. Drum Pawls
Figure 5B-5. Adjust Boom Hoist Pawls
Figure 5B-6. Lubricate U-Joints
Figure 5B-7. Propel Gear Case Level Plug
Figure 5B-8. Left and Right Drum Brakes (9215J107)
CHECK LEFT AND RIGHT DRUM BRAKES
Figure 5B-9. Planetary Brakes (9215J107-14)
Figure 5B-11 Chain Case Oil Level
CHANGE HIGH PRESSURE OUTLET FILTER
Figure 5C-2. Engine Oil Filter
Figure 5C-4. Crawler Track Adjustment
PERFORM QUARTERLY LUBRICATION
CLEAN COOLING SYSTEM
Figure 5E-2 Drain Hydraulic Reservoir
Figure 5E-5. Torque Converter Reservoir
CLEAN AIR BOX CHECK VALVES
Section VI. MACHINE STORAGE
DETROIT DIESEL PREPARATION
REMOVAL FROM SHORT TERM STORAGE
RESTORING TORQUE CONVERTER TO SERVICE