• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 10D-20. Bearing Assembled Between Shaft and Housing
Figure 10D-21. Throttle Shut Down Solenoid

Maintenance Manual For 40 Ton Crane Crawler Mounted Page Navigation
  266    267    268    269    270  271  272    273    274    275    276  
img
. .
5. If the solenoid has not been operating
Repairs to the solenoid are
REPAIRS.
properly, replace it.
limited to the plunger, dust boot, spring
and jam nut.  If the solenoid is not oper-
6. Set the solenoid up to the solenoid
ating properly, replace it.
the
bracket
and
secure
it
with
capscrews, lock washers and nuts.
To replace the shut
REPLACEMENT.
down solenoid,  proceed as follows (see
7. Install the electrical leads to the sole-
Figure 10D-21 on page 10D-19).
noid.
1. Mark and disconnect the electrical
8. Install the clevis on the solenoid actu-
leads from the shut down solenoid.
ating rod and adjust as indicated to give
the 35 arc between STOP and RUN.
2. Disconnect the throttle solenoid clevis
from the engine fuel shutdown lever.
9. Check the operation of the solenoid.
If the engine shut down mechanism needs
3. Remove the capscrews, lock washers
adjusting see subsection 11D.
and nuts securing the throttle solenoid
to the throttle bracket.
4. Remove the throttle solenoid. Remove
the clevis from the solenoid actuating
rod.
10D-18


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.