TM 5-3810-306-20SUPPLY, PRESSURE, AND RETURN LINES, SUPERSTRUCTURETOOLS:General mechanic’s tool kit: automotive (5180-00-177-7033)SUPPLIES: Loctite 545 (Item 13, Appendix C)Preformed packings as requiredEQUIPMENT CONDITIONS: Disconnect ground cable at shunt. (Refer to page 8-109.)REMOVAL:NOTEUse the following procedure toreplace all hydraulic lines.1.REMOVE HYDRAULIC LINE.a. Tag and disconnect both ends of hydraulic line.Remove line and preformed packing. Note routing forease in installation.b. Remove fittings and preformed packings asnecessary. Discard preformed packings.c. Inspect all parts for damage and replace asrequired.INSTALLATION:1.INSTALL HYDRAULIC LINE.a. Coat threads with Loctite 545 and performedpackings with clean hydraulic oil prior toinstallation.b. Install fittings and new preformed packing.Tighten securely.c. Route hydraulic line and connect both ends withnew preformed packings. Tighten securely.2.CONNECT GROUND CABLE AT SHUNT. REFERTO PAGE 8-109.)3.START ENGINE AND CHECK HYDRAULICFUNCTIONS. CHECK FOR LEAKS. (REFER TOTM 5-3810-306-10.)END OF TASK16-40
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business