TM 5-3810-306-20
b. Position emergency hand pump onto mounting
bracket (7), align holes and secure with four
capscrews (4), new lockwashers (5) and
flatwashers (6).
c. Remove tags and install hydraulic hose (1) with
new preformed packing (8) to emergency hand
pump (2).
2.
CONNECT GROUND CABLE AT SHUNT. (REFER
TO PAGE 8-109.)
3.
CHECK FOR PROPER OPERATION WHILE
PERFORMING
EMERGENCY
LOAD
LOWER
PROCEDURES (REFER TO TM 5-3810-30610.)
END OF TASK
16-47