TM 5-3810-307-10
PREPARATION FOR USE
3-1.
SUMMARY.
The crane is shipped in an "operation-ready" condition requiring no maintenance or operator
actions. However, it is recommended that a visual inspection of each system be made to ensure
hydraulic, fuel, and coolant lines or fittings have not loosened or been damaged during transit from
the manufacturer.
3-2.
UNPACKING.
The following should be used as a check list while unpacking the crane.
a.
Prepare the superstructure cab for use as follows:
1.
Remove the restraining straps on cab door.
2.
Remove cushion and tape around the LMI console, defroster fan, and load
chart.
3.
Remove tape securing seat arm rest in down position.
4.
Remove tape securing the fire extinguisher in its bracket.
5.
Remove tape on both sliding windows.
6.
Check and adjust the outside mirror.
b.
Prepare the carrier cab for use as follows:
1
Remove the restraining strap on cab door.
2.
Remove tape and cushion from the defroster fan.
3.
Remove tape securing fire extinguisher in its bracket.
4.
Remove tape on both sliding windows.
5.
Check and adjust the outside mirror.
c.
Unpack the technical manuals and store the operator's manual in the bracket
provided in the cab.
d.
Unpack and install the hook block. Refer to Section 6 of this manual for proper
cable reeving instructions.
e.
Straighten and adjust the hoist rotation mirrors.
f.
Remove the two sets of cab door lock keys. One set is tie wrapped under the