TM 5-3810-307-10
c.
Place START/OFF Switch (59) to START. Ensure POWER Green Indicator
(62) is lit. Heater fan will start after a short time delay.
d.
If FAULT Red Indicator (61) comes on, heater failed to start.
e.
If heater failed to start, wait two minutes and depress PUSH TO RESET
Button (60). Verify that FAULT Red Indicator (61) goes out.
f.
Repeat step c. to start heater.
g.
Shut down the diesel engine if applicable.
NOTE
The superstructure cab heater is factory set to
operate on diesel fuel (DF-2) with the carburetor fuel
adjustment knob installed so the pointed side of knob
is pointing to 6 o'clock position. To switch from DF-2
to JP-8, turn carburetor fuel adjustment knob 1/8 turn
clockwise. When switching back to DF-2, return fuel
adjustment knob to its original position.
5-8.4
Superstructure Cab Air Conditioner. Turn AIR CONDITIONER Control (58,
Figure 5-2) to
one of
the detent positions to
control air conditioner blower speed.
5-9.
INSTALLING AND OPERATING CLAMSHELL BUCKET.
WARNING
Always calculate the total weight of the load, then
operate within the load chart parameters.
NOTES
When computing Load Chart Limits, the weight of
accessories must be added. Weights for the clamshell
(Load Chart). Weights of other accessories may be
found in the manufacturer's equipment manuals.
The Eurotech clamshell has a working pressure
limitation of 3,500 psi (24,133 kPa). The Pro-
line/Anvil Model HG-760 has a maximum working
pressure limitation of 3,600 psi (24,822 kPa).
5-9.1
Installation.
a.
Preposition clamshell on firm level surface.
b.
c.
Position boom tip over center of clamshell.