TM 5-3810-307-10
Table H-6. Operator's Preventive Maintenance Checks and Services (PMCS) (Continued)
B Before Operation
A After Operation
Interval
D During Operation
W Weekly
No.
BDAW
Item to be Inspected
Procedure
Impact hammer and
d.
Inspect all attaching hardware, including the
14.
X
spotter slide greasing
impact hammer gib bolts, guide plate bolts,
and oiling (Continued)
and boom nose attaching hardware, for
security.
e. Lubricate the ground-release shackles as
necessary to keep them working smoothly.
Drain the waste fuel drip tank by performing the
15.
X
Waste Fuel Drip Tank
following procedure:
a. Remove the protective cap from the waste
fuel drip tank quick connect fitting located at
the bottom of the lower cylinder.
b. With one end in a suitable container, attach
the quick connect fitting of the waste fuel
drip tank drain hose to the waste fuel drip
tank quick connect fitting on the impact
hammer.
c. Drain all liquid from the waste fuel drip tank.
Lead Tower
Spotter
Spotter Slide
Lubrication
Fitting (1 of 2)
SPOTTER SLIDE SIDE VIEW
Figure H-16. Spotter Slide and Impact Hammer Service Points (Sheet 1 of 2)
Change 1 H-59